The plant needed more capacity without taking the existing treatment train offline.

Water Treatment · Houston, Texas
Texas Water Treatment Expansion
A staged pump train expansion gave a growing municipality more capacity without interrupting the existing treatment process.
Engineering breakdown
The operating constraint set the brief.
A phased pump train and tie-in plan added duty capacity while keeping commissioning windows short and controlled.
A parallel pump train, VFD-ready drives, and short tie-in windows allowed the plant to add capacity without taking the original treatment path offline.
42% more capacity · 0 unplanned outages · 6 mo delivery window
42%More capacity
0Unplanned outages
6 moDelivery window
Portfolio disclosure. The outcomes above are illustrative scenario references, not verified customer or business results.

System delivered
AF-X720 Pump Train
Performance outcomes are tracked against the operating goals established during design. This case study is an illustrative portfolio scenario, not a customer claim.