Texas Water Treatment Expansion facility
Water Treatment · Houston, Texas

Texas Water Treatment Expansion

A staged pump train expansion gave a growing municipality more capacity without interrupting the existing treatment process.

SystemAF-X720 Pump Train
Illustrative result42% more capacity
Engineering breakdown

The operating constraint set the brief.

Constraints

The plant needed more capacity without taking the existing treatment train offline.

Engineering decisions

A phased pump train and tie-in plan added duty capacity while keeping commissioning windows short and controlled.

Commissioning approach

A parallel pump train, VFD-ready drives, and short tie-in windows allowed the plant to add capacity without taking the original treatment path offline.

Measures

42% more capacity · 0 unplanned outages · 6 mo delivery window

42%More capacity
0Unplanned outages
6 moDelivery window

Portfolio disclosure. The outcomes above are illustrative scenario references, not verified customer or business results.

AF-X720 Pump Train equipment
System delivered

AF-X720 Pump Train

Performance outcomes are tracked against the operating goals established during design. This case study is an illustrative portfolio scenario, not a customer claim.